Naval Air: U.S. Navy Disbands A Carrier Strike Group

Archives

August 11, 2011: The U.S. Navy has disbanded one of its ten Carrier Strike Groups (SCGs), leaving only nine of them for the eleven aircraft carriers in service. This is a money saving measure, as nuclear powered aircraft (CVN) carriers spend twenty percent of their time out-of-service having maintenance done. Thus only 8-9 CSGs are needed at any one time.

The SCG is actually a complex organization. There is the CVN and its crew, and the CAW (Carrier Air Wing), which includes all the aircraft, pilots and support personnel. The CAWs do not stay with the same CVN, but move around. When a CVN goes in for maintenance, its CAW will move ashore and then to another carrier (usually one coming out of dry dock). Also part of a SCG are the escort ships (usually a destroyer squadron of 2-4 destroyers, cruisers or frigates) and one or two SSNs (nuclear attack subs). There are also one or two supply ships (carrying spare parts and maintenance personnel for all ships, as well as fuel for the escort ships.)

Until a few years ago, the U.S. had twelve carriers, but new ones are not being built quickly enough to replace the older ones that must retire (because of old age). Soon there will only be nine CVNs, and there will be cost cutting pressure to disband another SCG.

The most expensive down time for CVNs are those shipyard trips that involve refueling the nuclear reactors. Those operations can take nine months and include lots of repairs and upgrades all over the ship. There is a lot of maintenance involved with CVNs, enough to keep these carriers unavailable for over 20 percent of their career. Over its fifty years of service, each Nimitz class carrier has 17 planned trips back to the ship yard. There are twelve Planned Incremental Availability (or PIA) operations in which new gear is installed, worn or damaged stuff is replaced and any heavy duty work needed, is completed. Duration of a PIA varies with the amount of work to be done, but it can take several months, or a year or more.

Even more lengthily are the four Dry-docking Planned Incremental Availabilities (DPIA) operations, which are more extensive PIAs that include putting the ship into dry dock. These efforts can last a year or two. The one Refueling and Complex Overhaul (RCOH) is like the DPIA, except the ship is partially dismantled so that the spent nuclear fuel can be replaced. This takes a little longer than your usual DPIA, and often costs over half a billion dollars.

 

X

ad

Help Keep Us From Drying Up

We need your help! Our subscription base has slowly been dwindling.

Each month we count on your contribute. You can support us in the following ways:

  1. Make sure you spread the word about us. Two ways to do that are to like us on Facebook and follow us on Twitter.
  2. Subscribe to our daily newsletter. We’ll send the news to your email box, and you don’t have to come to the site unless you want to read columns or see photos.
  3. You can contribute to the health of StrategyPage.
Subscribe   contribute   Close